This project involved the installation of key stormwater infrastructure, including 23 m of 1200 mm concrete pipe and a 1350 mm wingwall to provide effective flow management. A 1200 mm alloy flap gate was installed to ensure reliable water control and backflow prevention.
The scope required careful pipework installation through an ECan stopbank, with all works carried out to meet regulatory requirements and maintain structural integrity. Dewatering and water diversion were managed on-site to ensure safe and efficient construction within an active watercourse environment.
The project was delivered with full attention to planning, sequencing, and quality control, providing a durable and maintainable solution that integrates seamlessly with the surrounding stormwater network while minimising environmental impact.
Bradleys Rd Stormwater Upgrade