This project involved the construction of 1,100 lineal meters of new footpaths, each 1.5 m wide, to improve site accessibility and pedestrian safety. Works commenced with detailed set-out and excavation of topsoil, followed by the importation and placement of 250 mm AP40 base course to provide a stable foundation.
A total of 1,100 m² of concrete footpath was formed and poured to precise levels and alignment, ensuring a durable and consistent finish. The works were completed with careful soil edging and seeding along the footpath boundaries, delivering a fully integrated, functional, and visually appealing pedestrian network.
All works were carried out with attention to quality, safety, and efficient site management, providing a long-lasting infrastructure asset that meets both operational and community requirements.
Eastern Reserve Footpaths