This project delivered new well and water network infrastructure to support ongoing site operations and improve system efficiency. Works included the installation of a new well pump and riser pipework, along with a fully detailed well headworks assembly constructed on a reinforced concrete slab and surrounding structure to ensure long-term durability and protection.
A new 250mm water main was installed to integrate with the existing network, incorporating fire hydrants, isolation valves, and all associated fittings. Power and communications infrastructure was upgraded through the installation of 100mm ducting to support control systems and future network expansion.
The project was completed with precision tie-ins to existing water mains, requiring careful coordination and sequencing to maintain operational continuity. All works were delivered to a high standard of safety, quality, and compliance, providing a robust and maintainable system ready for commissioning.